Palisade
Live Chat
Case Studies
Recently Added
Kinder Morgan / Riskcore Ltd.
Product: @RISK
Application: Modelling project cost contingency and escalation
Industry: Energy
Federal Home Loan Bank of Indiana
Product: @RISK
Application: Portfolio Credit Risk
Industry: Finance
Red Leaf Resources
Product: @RISK
Application: Developing new oil shale technologies
Industry: Energy & Utilities
Sinopec Engineering (Group) Co., Ltd (SEG)
Product: @RISK
Application: Evaluate petroleum and petrochemical projects valued over US$100m
Industry: Energy
Tesla Consultants
Product: @RISK
Application: Assessing Needs for Equipment Upgrades
Industry: Utilities
University of Adelaide
Product: @RISK
Application: Prediction of metal corrosion in salt water
Industry: Academic
University of Tasmania
Product: @RISK
Application: Evaluating production strategies for salmon farming
Industry: Agriculture/Aquaculture
National Grid UK
Product: @RISK
Application: Modeling electricity network restoration performance
Industry: Energy & Utilities
Solis Financial Forensics LLC
Product: @RISK
Application: Projecting Economic Damages for Attorneys Involved in Complex Lawsuits
Industry: Financial Forensics
CONTI-Group
Product: @RISK
Application: Financial Planning for Shipping Investment Funds
Industry: Shipping/Transport
Major Utility in Eastern US
Product: The DecisionTools Suite
Application: Load Forecasting
Industry: Utilities
Amway
Product: Custom Development
Application: Long-Range Capacity Planning
Industry: Manufacturing
L.E. Peabody & Associates
Product: @RISK
Application: Real Option Valuations of Power Plants
Industry: Energy & Utilities
Louisiana Department of Health
Product: Custom Development
Application: Large-scale Hospital Evacuation Planning
Industry: Government
Pellegrino & Associates
Product: @RISK
Application: Intellectual Property Valuation
Industry: Finance
Integral Consulting
Product: @RISK
Application: Mine Remediation
Industry: Environmental
University Of Victoria
Product: @RISK
Application: Lifetime Excess Cancer Risk
Industry: Academic
Rusnano
Product: The DecisionTools Suite
Application: Private equity investment in nanotechnology
Industry: Finance
MRAG Asia Pacific
Product: @RISK
Application: Quantifying Illegal Fishing
Industry: Environment
Netconomy
Product: @RISK
Application: Budget Forecasting
Industry: Finance
Department of Energy and Climate Change
Product: @RISK
Application: Carbon emission forecasts
Industry: Government
Academic
Brazilian Petroleum Institute
Product: @RISK
Application: Oil Exploration
Bucknell University
Product: PrecisionTree
Application: Technology Implementation
Cambridge University
Product: @RISK
Application: Climate Change
Columbia University
Product: @RISK
Application: Energy and Public Policy
Cornell University
Product: @RISK
Application: Financial Management
Curtin University of Technology
Product: @RISK
Application: Statistical analysis
DePaul University/Advanced Analytics LLC
Product: DecisionTools Suite
Application: Sports Wagering
Illinois State University
Product: @RISK
Application: Pharmaceutical R&D, Net Present Value, Internal Rate of Return
Illinois State University
Product: @RISK
Application: Real Options and Finance
INCAE Business School
Product: @RISK
Application: Finance and Capital Markets
Johnson Graduate School of Management, Cornell University
Product: @RISK
Application: Election Forecasting
Missouri University of Science and Technology
Product: @RISK
Application: Mining Engineering
Pace University
Product: StatTools, DecisionTools Suite
Application: Operations Research
Shanghai Jiao Tong University
Product: DecisionTools Suite
Application: Engineering system design and optimization
Swinburne University of Technology
Product: @RISK
Application: Venture Capital Management
Technical University of Denmark
Product: @RISK
Application: Transportation research
Tulane University
Product: @RISK
Application: Food Safety
University of Adelaide
Product: @RISK
Application: Prediction of metal corrosion in salt water
University of Houston
Product: DecisionTools Suite
Application: Managerial Decision Making
University of London Royal Veterinary College / EpiX Analytics
Product: @RISK
Application: Health and food safety
University Melbourne
Product: @RISK
Application: Forecasting Dairy Operating Profits
University of New Brunswick
Product: @RISK
Application: Reducing Environmental Impact of Commercial Aquaculture
University of Pennsylvania
Product: DecisionTools Suite
Application: Organizational Dynamics
University of Pretoria
Product: DecisionTools Suite, @RISK, TopRank
Application: Viral Exposure
University of Toronto
Product: DecisionTools Suite
Application: Financial Management
University Of Victoria
Product: @RISK
Application: Lifetime Excess Cancer Risk
University of Witwatersrand
Product: @RISK
Application: Mining Engineering
Virginia Commonwealth University
Product: @RISK
Application: Value at Risk Analysis

READ ALSO
In Agriculture:
Cornell University / Purdue University
Product: @RISK
Application: Agriculture Policy Assessment
University of Buenos Aires
Product: @RISK
Application: Agricultural Investment
University of Tokyo
Product: @RISK
Application: Agriculture
In Environment:
Cornell University /
Lower Colorado River Authority

Product: @RISK
Application: Natural Resource Mgmt
In Energy:
Cranfield University
Product: @RISK
Application: Equipment Reliability
In Finance:
London Business School /
Novartis Pharmaceutical

Product: @RISK, PrecisionTree, RISKOptimizer, DecisionTools Suite
Application: Portfolio Management
In Medical:
Royal Veterinary College
Product: @RISK
Application: Disease Prevention
Energy & Utilities
Abu Dhabi Water &
Electricity Company

Product: @RISK
Application: Demand Forecasting
Águas do Douro e Paiva
Product: @RISK
Application: Cost Reduction
Alesco Risk Management
Services Limited

Product: @RISK
Application: Risk modelling to determine optimum risk financing and insurance strategies
BC Hydro
Product: @RISK
Application: Project Analysis
Bigen Africa
Product: @RISK
Application: Demand and Cost Forecasting
Blade Energy
Product: @RISK
Application: Drilling Productivity
Carnegie Mellon University / Pittsburgh Technical
Product: @RISK
Application: Mitigating project schedule and cost overrun risk
Cinergy
Product: @RISK
Application: Acquisitions Analysis
Cranfield University
Product: @RISK
Application: Equipment Reliability
Det Norske Veritas (DNV)
Product: @RISK
Application: ROI of Different Projects
ECN
Product: @RISK
Application: Financial analysis of offshore wind farms
Enex
Product: DecisionTools Suite
Application: Project Planning
Fitness First
Product: @RISK, RISKOptimizer
Application: Energy Budget Resilience Optimization
Fluor Corporation
Product: @RISK
Application: Oil and Gas Estimating
Futuremetrics
Product: @RISK
Application: Price Hedging
Grupo ISA
Product: @RISK
Application: Investment Analysis
Hydroelectric Power in Colombia
Product: @RISK
Application: Cost estimation
IHS Energy Group
Product: @RISK Developer Kit
Application: Exploration, Drilling, and Production Analysis
Integrating Renewables with Electricity Storage
Product: @RISK
Application: Energy supply and Electricity Demand
Kinder Morgan / Riskcore Ltd.
Product: @RISK
Application: Modelling project cost contingency and escalation
L.E. Peabody & Associates
Product: @RISK
Application: Real Option Valuations of Power Plants
Major Utility in Eastern US
Product: The DecisionTools Suite
Application: Load Forecasting
Metaproject
Product: @RISK, PrecisionTree
Application: Rescue Operations
National Grid UK
Product: @RISK
Application: Modeling electricity network restoration
Northern Indiana
Public Service Company

Product: @RISK, Evolver, RISKOptimizer
Application: Pricing, Production Allocation for Regulation Compliance
Petrobras
Product: @RISK
Application: Exploration & Production
Red Leaf Resources
Product: @RISK
Application: Developing new oil shale technologies
RiskAdvisory
Product: @RISK Developer Kit
Application: Energy Production and Pricing
Rudd Asset Management (RAM)
Product: @RISK
Application: Waste disposal and renewable energy
Sark7
Product: Decision Tools Suite (@RISK, Precision Tree and Evolver)
Application: Optimising the business case for sustainable energy projects
Sinopec Engineering (Group) Co., Ltd (SEG)
Product: @RISK
Application: Evaluate petroleum and petrochemical projects valued over US$100m
Tesla Consultants
Product: @RISK
Application: Assessing Needs for Equipment Upgrades
Tioga Energy
Product: @RISK
Application: Solar energy savings
Transelectrica
Product: @RISK
Application: Measuring and Mitigating Open Market Risk
WEnergy Global
Product: @RISK
Application: Return on Investment

SEE ALSO:
Halcrow
Product: @RISK
Application: Flood Protection

SEE ALSO: INDUSTRY MODELS
» Energy Models

Environment
Air and Waste Management Association
Product: @RISK
Application: Estimating vehicles on congested roads
Aspinall & Associates
Product: @RISK, PrecisionTree, DecisionTools Suite
Application: Disaster Planning
AECOM
Product: @RISK
Application: Climate Change and Flooding Risk Assessment
Bristol’s Environmental Risk Research Centre (BRISK)
Product: DecisionTools Suite
Application: Disaster Planning
Cornell University /
Lower Colorado River Authority

Product: @RISK
Application: Natural Resource Management
Greenup Locks and Dam
Product: @RISK
Application: Dam maintenance and repair
Halcrow
Product: @RISK
Application: Flood Protection
Halcrow Group Ltd /
UK Environment Agency

Product: @RISK
Application: Flood Management
Integral Consulting
Product: @RISK
Application: Mine Remediation
Kennecott Utah Copper
Product: @RISK
Application: Pollution Cleanup
MRAG Asia Pacific
Industry: Environment
Application: Quantifying Illegal Fishing
NOAA Fisheries
Product: @RISK
Application: Estimating effects of dams on Atlantic salmon population dynamics
Purdue University
Product: @RISK
Application: Cost-benefit analysis of biofuel production under two government policies
Triangle Economic Research
Product: @RISK, PrecisionTree
Application: Pollution Cleanup
University of California, Berkeley
Product: @RISK
Application: Modeling extinction risk for Endangered Species
World Conservation Union
Product: @RISK, PrecisionTree, DecisionTools Suite
Application: Endangered Species Protection

READ ALSO
In Academic:
Cambridge University
Product: @RISK
Application: Climate Change
Sark7
Product: Decision Tools Suite (@RISK, Precision Tree and Evolver)
Application: Optimising the business case for sustainable energy projects
In Agriculture:
World Aquatic Veterinary Medical Association (WAVMA)
Product: @RISK
Application: Helping aquatic farmers to make informed choices that reduce risk of disease in their animals without extensive and costly testing
Finance
Albert Fensterstock Associates
Product: NeuralTools
Application: Credit and debt risk analysis
Benemerita Universidad Autonoma de Puebla
Product: @RISK
Application: Derivatives Pricing
Cynametrix
Product: DecisionTools Suite
Application: Portfolio Optimization including IDB
Federal Home Loan Bank of Indiana
Product: @RISK
Application: Portfolio Credit Risk
FiduciaryVest
Product: @RISK
Application: Asset Allocation, Value-at-Risk
George Washington University
Product: @RISK & RISKOptimizer
Application: Debt Portfolios, Capital Investments
London Business School /
Novartis Pharmaceutical

Product: @RISK, PrecisionTree, RISKOptimizer, DecisionTools Suite
Application: Portfolio Management
LStar Capital
Product: @RISK
Application: Risk Quantification in Film Financing
Merck
Product: @RISK
Application: Value-at-Risk Exchange Rate
Netconomy
Product: @RISK
Application: Budget Forecasting
Nighthawk Intelligence
Product: DecisionTools Suite
Application: Private label credit card (PLCC) accounts for major electronics retailer
Pellegrino & Associates
Product: @RISK
Application: Intellectual Property Valuation
Performance Thinking & Technologies
Product: @RISK & RISKOptimizer
Application: Hedge Fund management
Procter & Gamble
Product: @RISK, PrecisionTree, DecisionTools Suite
Application: Production Siting, New Product Analysis, Exchange Rate Analysis, Real Options
Risqworx
Product: @RISK
Application: Calculating investment risk and ROI
Rusnano
Industry: Finance/Banking
Application: Private equity investment in nanotechnology
RoseCap Investment Advisors
Product: @RISK
Application: Valuation of Direct Investment
Solis Financial Forensics LLC
Product: @RISK
Application: Projecting Economic Damages for Attorneys Involved in Complex Lawsuits

READ ALSO
In Academic:
Swinburne University of Technology
Product: @RISK
Application: Venture Capital Management
In Energy:
Cinergy
Product: @RISK
Application: Acquisitions Analysis
Grupo ISA
Product: @RISK
Application: Investment Analysis
In Government:
Her Majesty's Prison Service
Product: @RISK
Application: Cash Flow Analysis
In Insurance/Reinsurance:
Society of Actuaries /
Casualty Actuary Society

Product: @RISK
Application: Pension and Insurance Planning

SEE ALSO: INDUSTRY MODELS
» Finance/Banking Models
Recently Added
Kinder Morgan / Riskcore Ltd.
Product: @RISK
Application: Modelling project cost contingency and escalation
Industry: Energy
Federal Home Loan Bank of Indiana
Product: @RISK
Application: Portfolio Credit Risk
Industry: Finance
Red Leaf Resources
Product: @RISK
Application: Developing new oil shale technologies
Industry: Energy & Utilities
Sinopec Engineering (Group) Co., Ltd (SEG)
Product: @RISK
Application: Evaluate petroleum and petrochemical projects valued over US$100m
Industry: Energy
Tesla Consultants
Product: @RISK
Application: Assessing Needs for Equipment Upgrades
Industry: Utilities
University of Adelaide
Product: @RISK
Application: Prediction of metal corrosion in salt water
Industry: Academic
University of Tasmania
Product: @RISK
Application: Evaluating production strategies for salmon farming
Industry: Agriculture/Aquaculture
National Grid UK
Product: @RISK
Application: Modeling electricity network restoration performance
Industry: Energy & Utilities
Solis Financial Forensics LLC
Product: @RISK
Application: Projecting Economic Damages for Attorneys Involved in Complex Lawsuits
Industry: Financial Forensics
CONTI-Group
Product: @RISK
Application: Financial Planning for Shipping Investment Funds
Industry: Shipping/Transport
Major Utility in Eastern US
Product: The DecisionTools Suite
Application: Load Forecasting
Industry: Utilities
Amway
Product: Custom Development
Application: Long-Range Capacity Planning
Industry: Manufacturing
L.E. Peabody & Associates
Product: @RISK
Application: Real Option Valuations of Power Plants
Industry: Energy & Utilities
Louisiana Department of Health
Product: Custom Development
Application: Large-scale Hospital Evacuation Planning
Industry: Government
Pellegrino & Associates
Product: @RISK
Application: Intellectual Property Valuation
Industry: Finance
Integral Consulting
Product: @RISK
Application: Mine Remediation
Industry: Environmental
University Of Victoria
Product: @RISK
Application: Lifetime Excess Cancer Risk
Industry: Academic
Rusnano
Product: The DecisionTools Suite
Application: Private equity investment in nanotechnology
Industry: Finance
MRAG Asia Pacific
Product: @RISK
Application: Quantifying Illegal Fishing
Industry: Environment
Netconomy
Product: @RISK
Application: Budget Forecasting
Industry: Finance
Department of Energy and Climate Change
Product: @RISK
Application: Carbon emission forecasts
Industry: Government
DecisionTools Suite Cases
Aspinall & Associates
Industry: Environment
Application: Disaster Planning
Bristol’s Environmental Risk Research Centre (BRISK)
Industry: Environment
Application: Disaster Planning
Cal Poly, San Luis Obispo
Industry: Agriculture
Application: Financial Risk Management in Agriculture
Captum Capital
Industry: Healthcare/Pharmaceutical
Application: rNPV of New Companies and Technologies
Cynametrix
Industry: Finance
Application: Portfolio Optimization including IDB
DePaul University/Advanced Analytics LLC
Industry: Academia
Application: Sports Wagering
DNV GL SE
Industry: Shipping
Application: Risk and cost-benefit analysis to enhance the safety of ships and ship systems
Enex
Industry: Energy
Application: Geothermal Power Plant Equipment Procurement
Linksbridge SPC
Industry: Non-Profit
Application: Evaluating Efficacy of Public Health Initiatives
Logion BV
Industry: Transportation
Application: Transportation, Distribution, and Inventory Management
London Business School /
Novartis Pharmaceutical

Industry: Financing/Banking
Application: Portfolio Management
Major Utility in Eastern US
Industry: Utilities
Application: Load Forecasting
MegaFon
Industry: Telecommunications
Application: Enterprise Risk Management
Met-Mex Peñoles
Industry: Six Sigma
Application: Six Sigma Design of Experiments
Nighthawk Intelligence
Industry: Finance
Application: Private label credit card (PLCC) accounts for major electronics retailer
Novelis
Industry: Manufacturing
Application: Project Evaluation
PragmaRisk
Industry: Engineering, Construction
Application: Project cost and schedule risk analysis
Procter & Gamble
Industry: Academic
Application: Production Siting, New Product Analysis, Exchange Rate Analysis, Real Options
Rusnano
Industry: Finance/Banking
Application: Private equity investment in nanotechnology
Sark7
Industry: Sustainable energy (project consulting)
Application: Optimising the business case for sustainable energy projects
Shanghai Jiao Tong University
Industry: Finance
Application: Engineering system design and optimization
Triangle Economic Research
Industry: Environment
Application: Pollution Cleanup
Unilever
Industry: Manufacturing
Application: Product launch, capex, and many others
University of California San Diego School of Medicine
Industry: Healthcare / Pharmaceutical
Application: Public Health screening
University of Houston
Industry: Energy, Finance, Medical, and more
Application: Managerial Decision Making
University of Toronto
Industry: Academic
Application: Financial Management
University of Pretoria
Industry: Sciences
Application: Viral Exposure
World Conservation Union
Industry: Environment
Application: Endangered Species Protection

SEE ALSO
In StatTools:
Pace University
Industry: Academic
Application: Operations Research

In @RISK:
Northern Indiana
Public Service Company

Industry: Energy
Application: Pricing, Production Allocation for Regulation Compliance


@RISK Cases
Abu Dhabi Water &
Electricity Company

Industry: Energy and Utilities
Application: Demand Forecasting
African Risk Capacity (ARC)
Industry: Insurance/Reinsurance
Application: Assessing Catastrophic Drought Risk
Air and Waste Management Association
Industry: Environment
Application: Estimating vehicles on congested roads
Alesco Risk Management
Services Limited

Industry: Energy
Application: Risk modelling to determine optimum risk financing and insurance strategies
Amway
Services Limited

Industry: Manufacturing
Application: Long-Range Capacity Planning
Analytics
Industry: Academic
Application: Health and food safety
Águas do Douro e Paiva
Industry: Energy
Application: Cost Reduction
AgustaWestland
Industry: Aerospace
Application: New product development, feasibility studies, business initiatives
Antea Group
Industry: Environment
Application: Cost Justification of Water Recycling Systems
ARC of Yates
Industry: Non-Profit
Application: Budget Forecasting
AECOM
Industry: Environment
Application: Climate Change and Flooding Risk Assessment
BC Hydro
Industry: Energy
Application: Project Analysis
Benemerita Universidad Autonoma de Puebla
Industry: Finance
Application: Derivatives Pricing
Bigen Africa
Industry: Energy & Utilities
Application: Demand and Cost Forecasting
Blade Energy
Industry: Energy
Application: Drilling Productivity
Brazilian Petroleum Institute
Industry: Academic
Application: Oil Exploration
Broadleaf Capital International
Industry: Mining
Application: Schedule and Cost Risk, Project Management
Cambridge University
Industry: Academic
Application: Climate Change
Carnegie Mellon University / Pittsburgh Technical
Industry: Nuclear Energy / Energy Infrastructure
Application: Mitigating project schedule and cost overrun risk
Centre for Traffic
& Transport, Denmark

Industry: Transportation
Application: Transportation Planning
Cinergy
Industry: Energy
Application: Acquisitions Analysis
City of Edmonton / SMA Consulting
Industry: Transportation / Government
Application: Project management
Columbia University
Industry: Academic
Application: Energy and Public Policy
CONTI-Group
Industry: Shipping/Transport
Application: Financial Planning for Shipping Investment Funds
Cornell University
Industry: Academic
Application: Financial Management
CP Risk Solutions/
Illinois State University

Industry: Insurance
Application: Reinsurance Strategy
CP Risk Solutions/Illinois State University
Industry: Manufacturing
Application: Factory Shutdown
Cranfield University
Industry: Energy
Application: Equipment Reliability
Cornell University/
Lower Colorado River Authority

Industry: Environment
Application: Natural Resource Mgmt
Cornell University
Industry: Agriculture
Application: Agriculture Policy Assessment
Cummins Inc.
Industry: Six Sigma
Application: Six Sigma Quality Analysis
Curtin University of Technology
Industry: Academic
Application: Statistical analysis
Department of Energy and Climate Change
Industry: Government
Application: Carbon emission forecasts
Deloitte
Industry: Insurance/Reinsurance
Application: Cell Captive Insurance
Deloitte AIS
Industry: Insurance/Reinsurance
Application: Financial Planning for Environmental Rehabilitation
Det Norske Veritas (DNV)
Industry: Energy
Application: ROI of Different Projects
DNV GL
Industry: Energy
Application: Project Risk Management, Enterprise Risk Management, SHE Risk Management, Operational Risk Management
ECN
Industry: Energy research organisation
Application: Financial analysis of offshore wind farms
ENGCOMP
Industry: Government/Defense
Application: Budgeting
Federal Highway Adminstration
Industry: Transportation
Application: Pavement Cost Analysis
Federal Home Loan Bank of Indiana
Industry: Finance
Application: Portfolio Credit Risk
FiduciaryVest
Industry: Finance
Application: Asset Allocation, Value-at-Risk
Fitness First
Industry: Energy / Utilities
Application: Energy Budget Resilience Optimization
Fluor Corporation
Industry: Energy
Application: Oil and Gas Estimating
Fort McMurray Airport Authority (FMAA) / Revay and Associates Ltd.
Industry:Transportation
Application: Enterprise Risk Management (ERM)
Futuremetrics
Industry: Energy
Application: Price Hedging
Gemeente Hoorn
Industry: Government
Application: Urban Planning
Graphic Era University - Dehradun
Industry: Manufacturing
Application: Supply Chain Management
George Washington University
Industry: Finance
Application: Debt Portfolios, Capital Investments
Greenup Locks and Dam
Industry: Energy
Application: Dam maintenance and repair
Grupo ISA
Industry: Energy
Application: Investment Analysis
Halcrow
Industry: Energy & Utilities
Application: Flood Protection
Halcrow Group Ltd /
UK Environment Agency

Industry: Environment
Application: Flood Management
Her Majesty's Prison Service
Industry: Government
Application: Cash Flow Analysis
Hospital Clinic Barcelona
Industry: Medical
Application: Blood Screening
Hydroelectric Power in Colombia
Industry: Energy
Application: Cost estimation
Illinois State University
Industry: Academic / Pharmaceutical
Application: Pharmaceutical R&D, Net Present Value, Internal Rate of Return
Illinois State University
Industry: Academic
Application: Real Options and Finance
INCAE Business School
Industry: Academic
Application: Finance and Capital Markets
Integral Consulting
Industry: Environment
Application: Mine Remediation
Integrating Renewables with Electricity Storage
Industry: Energy & Utilities
Application: Energy Supply and Electricity Demand
JB Scherer Consulting Group LLC
Industry: Manufacturing
Application: Future Net Income Forecasting
Johnson Graduate School of Management, Cornell University
Industry: Academic / Politics
Application: Election Forecasting
Kewpie Corporation and University of Tokyo
Industry: Agriculture
Application: Food Safety
Katrina Disaster Response Center
Industry: Government
Application: Disaster Response Planning
Kennecott Utah Copper
Industry: Environment
Application: Pollution Cleanup
Kinder Morgan / Riskcore Ltd.
Industry: Energy & Utilities
Application: Modelling project cost contingency and escalation
KSU College of Veterinary Medicine
Industry: Agriculture
Application: Biosecurity to Avoid Disease Introduction
Kuwait Environment Public Authority
Industry: Government
Application: Air Quality
Larsen & Toubro Institute of
Project Management

Industry: Manufacturing
Application: Project Management
L.E. Peabody & Associates
Industry: Energy & Utilities
Application: Real Option Valuations of Power Plants
Lockheed Martin / NASA
Industry: Aerospace
Application: Schedule risk assessment
Louisiana Department of Health
Industry: Government
Application: Large-scale Hospital Evacuation Planning
LStar Capital
Industry: Finance
Application: Risk Quantification in Film Financing
Merck
Industry: Finance/Banking
Application: Value-at-Risk Exchange Rate
Missouri University of Science and Technology
Industry: Academic
Application: Mining Engineering
MRAG Asia Pacific
Industry: Environment
Application: Quantifying Illegal Fishing
Murray & Roberts
Industry: Construction
Application: Evaluating enterprise risks using risk modelling for a cash flow based approach
National Grid UK
Industry: Energy & Utilities
Application: Modeling electricity network restoration performance
Netconomy
Industry: Finance
Application: Budget Forecasting
New York City Department
of Health and Mental Hygiene

Industry: Medical
Application: Future Pandemic Planning
Northern Indiana
Public Service Company

Industry: Energy
Application: Pricing, Production Allocation for Regulation Compliance
NOAA Fisheries
Industry: Environment
Application: Estimating effects of dams on Atlantic salmon population dynamics
Pantektor AB
Industry: Construction
Application: Fire Risk Mitigation
Pareto Solutions
Industry: Government
Application: Budget Projection
Patrick Engineering / MBTA
Industry: Construction
Application: Cost and Schedule Risk Analysis
RD&I Consulting
Industry: Construction
Application: Fehmarn Belt Fixed Link
Pellegrino & Associates
Industry: Finance
Application: Intellectual Property Valuation
Petrobras
Industry: Energy
Application: Exploration & Production
Preformed Line Products
Industry: Manufacturing
Application: Tolerance Stacking
ProjectPMO
Industry: Aerospace
Application: Schedule and Cost Risk, Project Management
Post Danmark / PricewaterhouseCoopers
Industry: Government
Application: Insurance Premium Reduction
Purdue University
Industry: Environment, Government
Application: Cost-benefit analysis of biofuel production under two government policies
Red Leaf Resources
Industry: Energy & Utilities
Application: Developing new oil shale technologies
RisqWorx
Industry: Property
Application: Calculating investment risk and ROI
Royal Veterinary College
Industry: Medical
Application: Disease Prevention
RoseCap
Industry: Finance/Banking
Application: Valuation of Direct Investment
Rudd Asset Management (RAM)
Industry: Energy
Application: Waste disposal and renewable energy
Scottsdale Insurance Company
Industry: Insurance
Application: Comparing commercial properties; RAROC
Shanghai Food and Drug Administration
Industry: Government
Application: Food safety, monitoring contaminants
Sinopec Engineering (Group) Co., Ltd (SEG)
Industry: Energy
Application: Evaluate petroleum and petrochemical projects valued over US$100m
Slovak Rail Company
Industry: Transportation
Application: Capital Investment
Society of Actuaries/
Casualty Actuary Society

Industry: Insurance/Reinsurance
Application: Pension and Insurance Planning
Solis Financial Forensics LLC
Industry: Financial Forensics
Application: Projecting Economic Damages for Attorneys Involved in Complex Lawsuits.
Solvĕre
Industry: Transportation
Application: Transportation Infrastructure
Swinburne University of Technology
Industry: Academic
Application: Venture Capital Management
SzigmaSzervíz Ltd
Industry: Manufacturing
Application: Project Management
Technical University of Denmark
Industry: Academic
Application: Transportation research
Tesla Consultants, Delta Utilities
Industry: Utilities
Application: Assessing Needs for Equipment Upgrades
Thales Group
Industry: Manufacturing
Application: Market Feasibility
Tioga Energy
Industry: Energy
Application: Solar energy savings
Transelectrica
Industry: Power
Application: Measuring and Mitigating Open Market Risk
Transae/Réseau Ferré de France
Industry: Transportation
Application: PPP rail project financing
Transnet
Industry: Transportation
Application: Freight Transport
Tulane University
Industry: Academic
Application: Food Safety
UK Ministry of Defence
Industry: Defence
Application: Project Management
University of Adelaide
Industry: Academic
Application: Prediction of metal corrosion in salt water
University of Arkansas
Industry: Agriculture
Application: Analyzing Hybrid Varieties of Rice Crops
University of Buenos Aires
Industry: Agriculture
Application: Agricultural Investment
University of California, Berkeley
Industry: Environment
Application: Modeling extinction risk for Endangered Species
University Melbourne
Industry: Academic / Agriculture
Application: Forecasting Dairy Operating Profits
University of New Brunswick
Industry: Academic / Agriculture
Application: Reducing Environmental Impact of Commercial Aquaculture
University of Pennsylvania
Industry: Academic
Application: Organizational Dynamics
University of Texas Southwestern Medical Center
Industry: Health
Application: Evaluating kidney function for organ transplant
University of Tasmania
Industry: Agriculture/Aquaculture
Application: Evaluating production strategies for salmon farming
University of Tokyo
Industry: Agriculture
Application: Food safety, detection of BSE
University Of Victoria
Industry: Academic
Application: Lifetime Excess Cancer Risk
University of Witwatersrand
Industry: Academic
Application: Mining Engineering
US Army Materiel Systems Analysis Activity (AMSAA)
Industry: Government / Defense
Application: Schedule and Cost Risk for Acquisitions
Value Management Strategies, Inc.
Industry: Government, Manufacturing
Application: Project management, cost estimation, event risk
Virginia Commonwealth University
Industry: Academic
Application: Value at Risk Analysis
Visual Reporting / Danish Government / Agency for Digitisation
Industry: Government, IT
Application: Risk assessment of major IT projects
WEnergy Global
Industry: Energy
Application: Return on Investment
Wright Homes
Industry: Construction
Application: Real Estate Development
World Aquatic Veterinary Medical Association (WAVMA)
Industry: Environment
Application: Aquaculture and biosecurity

SEE ALSO: INDUSTRY MODELS
» Example Models

In DecisionTools Suite:
Aspinall & Associates
Industry: Environment
Application: Disaster Planning
Enex
Industry: Energy
Application: Geothermal Power Plant Equipment Procurement
Logion BV
Industry: Transportation
Application: Transportation, Distribution, and Inventory Management
London Business School /
Novartis Pharmaceutical

Industry: Financing/Banking
Application: Portfolio Management
Triangle Economic Research
Industry: Environment
Application: Pollution Cleanup
Procter & Gamble
Industry: Finance
Application: Production Siting, New Product Analysis, Exchange Rate Analysis, Real Options
World Conservation Union
Industry: Environment
Application: Endangered Species Protection

In @RISK Developer Kit:
London Underground / Istria
Industry: Transportation
Application: Transportation Safety and Investments

In Evolver:
Mettler Consulting
Industry: Insurance/Reinsurance
Application: Enterprise Resource Planning


ENGCOMP Uses Palisade’s @RISK Software To Define Budget for Canadian Department of National Defence’s Ongoing Fleet Maintenance Facility Project

ENGCOMP is a Saskatchewan-based structural, mechanical and cost engineering consulting firm. Catering to Canada's commercial and heavy industrial market, it provides engineering services to the potash, uranium, oil and gas, pulp and paper, chemical processing, and food processing industries in Saskatchewan and Alberta.

With structural engineering as its core business, ENGCOMP also specialises in risk analysis, cost estimation, planning and computer task automation.

ENGCOMP was contracted to assist the Canadian Department of National Defence (DND) to define the budget for the fourth phase of construction of its ongoing Fleet Maintenance Facility Cape Breton (FMF CB) project located at the Canadian Forces Base Esquimalt, Victoria, BC. Using Palisade’s risk analysis software, @RISK, ENGCOMP conducted Monte Carlo simulations to quantify the uncertainty in defining the budget and schedule for this project.

Project status
The FMF CB project has been ongoing for more than 10 years. DND was looking to consolidate and upgrade the FMF, which includes smaller facilities, spread all over Base Esquimalt’s Dockyard area, into one large facility. To do this, DND needed to evaluate its remaining budget and existing schedule to complete the fourth phase of construction.

Whilst risk assessments had been conducted on the project in the past, a true risk analysis using Monte Carlo simulation had yet to be completed. Monte Carlo simulation, a quantitative statistical modelling tool, is important to this project as it can help reduce budget uncertainty and greatly increase the likelihood of achieving project success.

Jason Mewis, President, ENGCOMP, says, “Risk analysis is crucial to the cost and schedule management of any project, and must include a scientific approach to contingency and risk reserve estimation. As a concept, Monte Carlo simulation has been around for a long time, but is not widely used, and where it is used it is primarily applied to just capital cost estimation. A Monte Carlo-based simulation tool such as @RISK can help reduce uncertainty, greatly increasing the chances of project success.”

ENGCOMP developed a system that breaks down the Monte Carlo simulation into two – a simulation for Contingency Analysis and one for Project Risk Analysis.

Using @RISK to define the contingency budget
Contingency is a very important aspect of budgeting and needs to be accounted for properly to ensure project success. It is the amount of money that needs to be added to a project budget to account for all the expected construction costs that haven’t been itemised at the time of budgeting.

As the first component of its Monte Carlo simulation-based risk analysis, ENGCOMP needed to determine the amount of contingency that would be required to be applied to the project budget, with a reasonable level of confidence, that the final approved budget for the FMF CB project would not be exceeded. Using @RISK, ENGCOMP aimed to quantify the potential variability of factors such as labour rates, material and equipment costs and productivity, to ascertain the amount of contingency that should be allocated to the overall project budget.  

ENGCOMP assessed the contribution of the various work packages in the cost estimate to determine the total contingency required for the project. A work package represents a collection of work actions necessary to create a specific result. It is typically defined by statements of activity description, activity resources of skill and expertise, estimates of activity duration, activity schedule and activity risks.

ENGCOMP used @RISK to calculate the total project cost, both with and without estimated variability on the work packages. The difference between the two totals yielded the contingency for the project. 

The results of the @RISK Monte Carlo simulation for the contingency analysis showed that the bulk of the budget uncertainty was due to market volatility and unknown site conditions. Existing FMF functions are located in facilities that were used for industrial functions that historically were relatively unregulated. Site investigations indicated potential contamination below these old structures. However, the requirement to maintain ongoing operations precluded the option of removing the buildings to conduct the comprehensive testing necessary to establish definitively the nature and extent of contamination and the related costs for removal and disposal. Therefore, the DND needed to assign significant contingency budget towards the demolition and decontamination activity. 

Using @RISK to model risk to quantify risk reserve and project schedule contingency
The aim of the Project Risk Analysis was to take the Contingency Analysis to the next level, quantifying the effects of all reasonable risks and uncertainties on the project.

This component of the @RISK Monte Carlo simulation accounted for those items that are not required to construct the project, but should they occur, then DND would be expected to pay for them under the cost of the project. These factors included market conditions, environmental issues, internal operational issues and organisational changes that could collectively impact on the successful completion of the FMF CB project. For instance, the @RISK simulation aimed to quantify the uncertainty posed by unforeseen developments such as  weather conditions preventing construction, labour strikes, delays in environmental approval, labour shortages, currency fluctuations, and safety, to name a few. Such occurrences can affect both the project’s cost and schedule.

@RISK enabled ENGCOMP to estimate the impact of the variability and uncertainties pertaining to risks, costs and scheduling. This assessment enabled them to estimate the project risk budget as well as the Risk Reserve and Schedule Contingency. 

A key finding of the Project Risk Analysis was that, taking into account all the risk and uncertainties on the project, there is an 85 percent certainty that the FMF CB project will be completed by January 2014.

Project secures approval from Federal Government’s Treasury Board, despite high level of cost uncertainty
Canada’s DND operates infrastructure projects under highly regulated and controlled regime, as one might expect given the nature of the organisation. This means that securing project funding approval in a timely fashion represented a huge challenge for DND. For the FMF CB consolidation project, this challenge was further compounded as there were numerous other organisational and technical problems.  Therefore, establishing and presenting the budget in a manner that would confidently demonstrate its successful completion was imperative.

Mewis explains, “We were able to help the DND define the budget as well as give them the tools to defend it. Based on our quantitative risk analysis, DND was able to clearly justify to the Federal Government’s Treasury Board why it should be allowed to get the capital appropriation for the project despite the level of uncertainty. This may not have been possible without the detailed and comprehensive analysis enabled by @RISK.”

The FMF CB project has been authorised and is in progress. In addition, due to the success of the risk analysis undertaken by ENGCOMP, DND is talking with the company about possibly preparing a policy on performing this level of detailed Monte Carlo simulation-based analysis for all future DND projects.
 

Additional Information

Distributions used
Predominantly, ENGCOMP used the Trigen function, which enabled them to account for the inherent error relating to the subjective estimation of uncertainty. They used a structured calibration training process for all the analyses so that the ‘Subject Matter Experts’ (SME’s) could be as “good” as possible at estimating uncertainty.  Also, as sometimes groups cannot be fully calibrated, the process highlighted to what degree the team was calibrated, giving ENGCOMP the ability to adjust the estimated values to reflect the appropriate level of confidence. 

There were cases where ENGCOMP used a Pert distribution if there was a lot of skew towards a particular parameter in the estimated distribution. This helped smooth out the Triangular distribution and put less emphasis on the tails in the analysis.

Graphs

Graph 1: ENGCOMP’s Risk Induced Second S-Curve Diagram

This graph is used to clearly distinguish between the varying levels of cost uncertainty encountered on the project.

The blue line represents the base total cost estimate. The red S-curve is derived from the Contingency Analysis process and represents the variability in the cost estimate for the project.  The difference between the blue line and the red S-curve is the ‘contingency’ cost that needs to be applied to the total project cost. 

The green S-curve represents the results of the Project Risk Analysis (PRA), which adds the impact of schedule uncertainty and outside risk factors to the total project cost with contingency.  At any given level of confidence, the difference between the two curves is the Risk Reserve budget. 

Graph 2: Histogram for the Total Project Cost

This graph represents the population of data that was generated during the analysis and gives the general shape of the data distribution. It depicts the total project cost including the contingency budget.

Graph 3: The Tornado Graph

This graph represents the sensitivity analysis done within each simulation. It displays the the cost drivers that have the most impact on the bottom line and how they correlate to the total cost. The longer the bar, the larger the impact it has on the bottom line if it varies.  This graph shows that the decontanmination activity induces the most uncertainty in the estimation of the total project cost.

» @RISK
» More about ENGCOMP

Palisade Corporation
798 Cascadilla Street
Ithaca, NY 14850-3239
800 432 RISK (US/Can)
+1 607 277 8000
+1 607 277 8001 fax
sales@palisade.com
Palisade EMEA & India
+44 1895 425050 salesEMEA@palisade.com
salesIndia@palisade.com
Palisade Asia-Pacific
+61 2 9252 5922
salesAP@palisade.com
Palisade アジア・
パシフィック東京事務所
+81 3 5456 5287 tel
sales.jp@palisade.com
www.palisade.com/jp/
Palisade Latinoamérica
+1 607 277 8000 x318
+54-1152528795  Argentina
+56-25813492 Chile
+507-8365675 Panamá
+52 55 5350 2852 México
+511-7086781 Perú
+57-15085187 Colombia
servicioalcliente@palisade.com
ventas@palisade.com
www.palisade-lta.com
Palisade Brasil
+55 (21) 3958 1443
+1 607 277 8000 x318 tel
vendas@palisade.com
www.palisade-br.com